Construction Suite
All Guides

COSHH

Control of Substances Hazardous to Health assessments for site materials and processes

15 documents·15 mandatory·0 best practice
COSHHMandatory

COSHH Assessment — Adhesives and Resins

This COSHH assessment covers epoxy resins, polyurethane adhesives, contact adhesives, and other bonding agents used in construction. It addresses skin sensitisation, respiratory irritation from isocyanates, and the risk of occupational asthma. Two-part resin systems require specific mixing controls and adequate cure-time ventilation.

COSHH Regs 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Asbestos

This COSHH assessment specifically addresses asbestos fibre exposure during construction and refurbishment work. Asbestos is the single greatest cause of work-related deaths in the UK. It covers the three main asbestos types (chrysotile, amosite, crocidolite), control limits, decontamination procedures, and the legal requirement for licensed removal of certain asbestos-containing materials.

CAR 2012

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Cement and Concrete

This COSHH assessment covers the health risks from cement and concrete products including dermatitis from skin contact with wet cement, respiratory irritation from cement dust, and chromium VI sensitisation. It mandates the use of barrier creams, waterproof gloves, and dust suppression measures during mixing and cutting operations.

COSHH Regs 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Fuels and Oils

This COSHH assessment covers diesel, petrol, hydraulic oils, lubricants, and cutting fluids used on construction sites. It addresses dermatitis from prolonged skin contact, fire and explosion risks, and environmental contamination from spills. Bunded storage, spill kits, and drip trays must be provided for all fuel and oil storage areas.

COSHH Regs 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — General Site

The General Site COSHH Assessment identifies hazardous substances commonly encountered across construction activities and establishes baseline control measures. It covers dust, cleaning chemicals, fuels, and commonly used construction materials. This assessment provides the overarching framework under which substance-specific COSHH assessments sit.

COSHH Regs 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Lead at Work (General)

A COSHH assessment for lead exposure beyond decorative paint, covering lead sheet roofing, flashings, soldering, bossing, lead pipework, lead-primed structural steel, and demolition. WEL 0.15 mg/m³ inhalable dust and fume. Hot lead work (soldering, bossing, burning) generates fume requiring supplied air RPE, not just FFP3. Blood lead monitoring required under CLAW 2002 where significant exposure occurs. Suspension levels: 60 µg/dL males, 30 µg/dL females.

Control of Lead at Work Regulations 2002 + COSHH 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Lead Paint

This COSHH assessment covers the risks of disturbing lead-based paint during refurbishment, strip-out, or maintenance of pre-1970s buildings. Lead exposure causes neurological damage, kidney disease, and reproductive harm. Controls include wet removal methods, HEPA-filtered extraction, blood lead monitoring, and specialist waste disposal as hazardous waste.

COSHH Regs / Control of Lead Regs

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Legionella

This COSHH assessment covers legionella risks from water systems on construction sites and in newly completed buildings. Stagnant water in temporary supplies, dead legs, and cooling towers can harbour Legionella pneumophila bacteria. It requires written schemes of control, temperature monitoring, regular flushing regimes, and competent water treatment management.

COSHH Regs / L8 ACoP

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Mould and Biological Agents

This COSHH assessment covers exposure to mould, fungi, bacteria, and other biological agents encountered during refurbishment, demolition, or work in damp buildings. It addresses respiratory sensitisation, allergic reactions, and infection risks. Control measures include RPE, containment, specialist cleaning, and appropriate waste disposal procedures.

COSHH Regs 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Paints and Solvents

This COSHH assessment addresses health risks from paints, varnishes, stains, thinners, and solvents used in construction. It covers inhalation of volatile organic compounds, skin absorption, and flammability risks. Substitution with water-based products should be considered first, with adequate ventilation and respiratory protection provided where solvent-based products are necessary.

COSHH Regs 2002

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Silica Dust

This COSHH assessment addresses respirable crystalline silica (RCS) dust generated by cutting, drilling, and grinding concrete, stone, brick, and morite. Silica exposure can cause silicosis, lung cancer, and COPD. The workplace exposure limit is 0.1 mg/m3 and control measures must include water suppression, on-tool extraction, and RPE where limits may be exceeded.

COSHH Regs 2002 / WEL

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Welding Fumes

This COSHH assessment addresses welding fume exposure which the HSE reclassified as a carcinogen in 2019. All welding fumes, including mild steel, now require engineering controls such as LEV or on-torch extraction. It covers MIG, TIG, MMA, and oxy-fuel processes, and addresses manganese, chromium, and nickel fume components.

COSHH Regs 2002 / WEL

Pre-ConstructionComing soon
COSHHMandatory

COSHH Assessment — Wood Dust

This COSHH assessment covers wood dust exposure from cutting, sanding, routing, and planing timber. Hardwood dust is a known carcinogen and softwood dust causes respiratory sensitisation. The workplace exposure limit for wood dust is 3 mg/m3 (hardwood) and 5 mg/m3 (softwood). On-tool extraction and LEV systems are the primary control measures.

COSHH Regs 2002 / WEL

Pre-ConstructionComing soon
COSHHMandatory

Safety Data Sheet Register

The Safety Data Sheet Register collects and organises manufacturer safety data sheets (SDS) for every hazardous substance used on site. SDS documents provide critical information on hazards, first aid measures, handling precautions, PPE requirements, and emergency spill procedures. The register must be accessible to all workers and kept current with the substance inventory.

COSHH Regs 2002

ConstructionComing soon
COSHHMandatory

Substance Inventory and Hazmat Register

The Substance Inventory and Hazmat Register is a live record of all hazardous substances brought onto site, their locations, quantities, and associated safety data sheets. It enables emergency responders to identify hazards quickly and ensures all substances have been assessed under COSHH before use. The register must be updated whenever new substances arrive on site.

COSHH Regs 2002

ConstructionComing soon