Traffic Management Plan

The Traffic Management Plan establishes safe vehicle and pedestrian routes on and around the construction site, including one-way systems, speed limits, segregation barriers, banksman requirements, and delivery scheduling. It addresses the interface between construction traffic and public highways, requiring coordination with the local authority where road closures or diversions are needed.

Last reviewed: 29 March 2026 — This guide reflects UK law as of this date. CDM 2015 / TSRGD remains current with no amendments enacted as of 29 March 2026. Next scheduled review: 29 March 2027.

Traffic Management — Separating People and Plant

Vehicle and pedestrian interaction is a consistently fatal risk. An excavator/dumper operator has significantly reduced visibility, moves in limited space, and operates where workers may not expect plant. The traffic management plan is the primary mechanism for reducing risk through physical separation, route planning, and behavioural controls.

The plan must be prepared before construction begins and updated as the site layout changes.

“Pedestrian/plant separation is the non-negotiable priority — exclusion zones must be physical, not just painted lines” — Painted lines are better than nothing but physical barriers (Jersey barriers, Heras fencing, safety fencing) are significantly more effective. Where barriers cannot prevent all interaction, banksmen with Stop/Go boards must control all movements.

Traffic Management Plan — Key Content

ElementContent
Site layout planTraffic route map: vehicle routes, pedestrian routes, crossing points, loading/unloading zones, speed limit zones, turning areas.
Vehicle routesOne-way where possible. Adequate width for the largest vehicle. Passing places where two-way. Hard standing where soft ground risk.
Pedestrian routesPhysically separated from vehicle routes. Clearly signed. Adequate width. No dead ends.
Speed limits5mph (or site-specific) at all entrances and throughout. Physical calming where necessary.
Banksman requirementsRequired for: all reversing; plant near pedestrian routes; delivery vehicle unloading.
Delivery managementPre-booking system. Delivery windows. Sized for site — no oversized vehicles without arrangement.
Public road interfaceSite entrance management (traffic lights, banksmen). Wheel wash if needed. Hoarding on footway.
Emergency accessEmergency vehicle route maintained clear. 5.0m minimum clear width for fire appliance.

Common Mistakes

1

No physical separation — relying on markings — painted corridors do not prevent a reversing dumper from entering a pedestrian zone. Physical barriers (Heras, concrete, Jersey blocks) are the standard. Banksmen at crossing points.

2

Reversing without banksmen — all reversing on a busy site should involve a trained banksman (CPCS A40) with clear sight of the vehicle and area. Mirrors have significant blind spots especially for excavators/dumpers.

3

Not updating as site develops — a groundworks plan is unsuitable for the fit-out phase. Must review and update as layout and primary traffic types change. Workers re-briefed.

4

Inadequate sight lines at site exit onto public road — hoarding, parked vehicles, and deliveries can obstruct. A banksman must control at the road interface. The plan must specifically address exit junction visibility.

5

No wheel wash — muddy vehicles on public roads create hazards and enforcement issues with the local authority. Assess need and document the decision. Install where there is significant vehicle mud risk.

Frequently Asked Questions

What are the minimum traffic route widths?
CDM does not specify but HSE guidance states: single lane one-way 3.5m (cars/light), 5m+ (HGVs); two-way 7m for two HGVs; emergency 5m minimum for fire appliance; pedestrian 1m minimum, wider for high volumes.
When is a banksman required vs optional?
Required wherever: vehicles reversing near pedestrians; plant near pedestrian routes; large delivery vehicles manoeuvring; crane/hoist operations need traffic control. Must be trained, hi-vis, agreed signals, positioned to see both vehicle and hazard.
Does the TMP address car parking?
Yes, on larger sites. Worker car parking creates pedestrian/vehicle interface risk — especially at start/end of day. Identify parking location, pedestrian route from parking to welfare and work areas, and controls at the interface.
What permissions are needed for traffic management on a public road?
Lane/footway closures — highway authority (4-6 weeks notice). Traffic light signals — highway consent. Works to road/utilities — NRSWA or TMA permit. Large abnormal loads — police and highway authority. Chapter 8 of the Traffic Signs Manual provides the technical standard.

Generate your Traffic Management Plan on Construction Suite

Construction Suite walks you through every required section with a guided Q&A — built to CDM 2015 / TSRGD — and generates a professionally formatted document in minutes.

Get started free

This guide is for general informational purposes only and does not constitute legal advice. While every effort is made to ensure accuracy, regulations change and individual project circumstances vary. Construction Suite is a trading name of Xzist Digital Ltd, registered in England and Wales.

Generate this document