Site Management · Mandatory · Pre-Construction
Fire Evacuation Plan
The Fire Evacuation Plan details the procedures for evacuating the construction site in the event of a fire, including alarm activation, escape routes, assembly points, roll-call procedures, and fire marshal duties. It must account for all site occupants including those with mobility impairments and be practised through regular drills. The plan must be updated as the building progresses and escape routes change.
Last reviewed: 29 March 2026 — This guide reflects UK law as of this date. RRO 2005 remains current with no amendments enacted as of 29 March 2026. Next scheduled review: 29 March 2027.
Fire Evacuation Plan — Site-Specific and Practiced
The fire evacuation plan describes what happens from the moment a fire is discovered to all persons safely at the muster point and the Fire and Rescue Service called and given access. It must be specific to this site, at this stage, with these escape routes and this alarm system.
A plan that exists but has never been practiced is a theory. Workers who have never heard the alarm or walked the escape route will not perform a rapid, orderly evacuation.
“Evacuation plan must be updated every time escape routes or site layout changes” — Construction site layouts change constantly. An escape route viable at groundworks may be blocked by scaffold at structural frame, and may change again at fit-out. A plan reflecting a previous stage may direct workers towards blocked or non-existent routes.
Fire Evacuation Plan — Key Content
| Element | Content |
|---|---|
| Alarm signal | What the alarm sounds like. Where alarm points/break-glass are located. Action on hearing. |
| Raise alarm | How to raise: break-glass point; call site manager; call 999. Who calls 999. |
| Escape routes | Primary and secondary from each area. Marked on site plan. Updated as site progresses. |
| Assembly point | Muster point location. Clearly signed and accessible. Far enough from structure (minimum 15m typical). |
| Roll call | Site manager takes roll call from attendance register. All persons accounted for — confirm to FRS. |
| Fire warden | Named fire warden for each area/floor. Sweep procedure. Report to site manager. |
| FRS access | Which gate provides access. Key box code. Named person to meet FRS. Site plan provided. |
| Re-entry | No person to re-enter until FRS gives all-clear. |
| Drill schedule | Frequency of drills. Next planned date. |
Common Mistakes
Muster point too close to building or blocking FRS access — must be outside the falling debris zone and not block the FRS access route. Typically 15m from low-rise, more for taller structures. Confirm with FRS.
Fire drills not conducted — many sites never conduct a drill. Required under RRO 2005. Large sites every 3 months. Records must be kept including time to evacuate, issues, and actions taken.
Evacuation plan not updated after scaffold erection — scaffold may block the primary escape route and create new routes via scaffold stairs. Must update immediately and re-brief workers.
Roll call not possible — no accurate attendance register — the plan includes 'roll call using register' but this is only effective if the register is accurate and accessible. F7 and F4 must be kept current.
FRS cannot access site — locked gate with no key access provision — common and potentially catastrophic. Key safe location must be communicated to FRS in advance. Emergency gate opening must be in the evacuation plan. Key safe codes and site plans registered with the local FRS station.
Frequently Asked Questions
How often must a fire drill be conducted?
What is the fire warden's role during evacuation?
Does the plan need to cover RIDDOR?
Should the plan include procedures for specific scenarios?
Generate your Fire Evacuation Plan on Construction Suite
Construction Suite walks you through every required section with a guided Q&A — built to RRO 2005 — and generates a professionally formatted document in minutes.
Get started freeThis guide is for general informational purposes only and does not constitute legal advice. While every effort is made to ensure accuracy, regulations change and individual project circumstances vary. Construction Suite is a trading name of Xzist Digital Ltd, registered in England and Wales.