Construction Suite

Site Management · Mandatory · Construction

Site Induction Register

The Site Induction Register is a master log of all persons who have completed a site induction, recording their name, employer, trade, CSCS card details, induction date, and inductor. It provides an auditable record that everyone on site has been inducted and enables the principal contractor to verify compliance at any time. The register must be maintained and available for inspection throughout the project.

Last reviewed: 29 March 2026 — This guide reflects UK law as of this date. CDM 2015 remains current with no amendments enacted as of 29 March 2026. Next scheduled review: 29 March 2027.

1. The Induction Register — Emergency and Audit Tool

The induction register serves a dual purpose: it is an audit document proving CDM compliance, and an emergency management tool enabling roll-call during evacuation. In a fire evacuation, the site manager reaches the muster point and calls names. Anyone unaccounted for may be trapped — the Fire and Rescue Service needs to know who is missing. The register must be accurate, current, and immediately accessible.

The induction register must be accessible during an emergency — not filed away

Keep it in a clearly marked, brightly coloured folder at the site entrance or site manager's desk. Consider a laminated cover: ‘EMERGENCY — DO NOT REMOVE WITHOUT AUTHORITY.’ All site managers must know where it is and be able to retrieve it within seconds of the alarm.

2. What to Record

FieldContent
Worker nameFull name.
CompanyEmploying company or "self-employed".
Trade/roleJob role or trade.
CSCS card typeCard type and expiry date (if checked at induction).
Induction dateDate conducted.
Inducted byName of person conducting.
Worker signatureConfirming they attended.
ID checkType of identification checked (if applicable).
Still on siteActive / Departed — running record for current workforce.

3. Common Mistakes

1

Using the register as the only induction record with no individual forms

The register is a summary list. It cannot demonstrate what topics were covered or whether the worker understood. HSE wants both the register and individual induction records.

2

Not removing departed workers from the "active" column

If the register includes workers who left 3 months ago, it is impossible to determine who is actually missing during an emergency.

3

Not capturing agency workers, casual labourers, and delivery drivers

An agency worker arriving for a week with no induction is a CDM failure. The PC's rules apply to everyone on site.

4

Register not updated in real time

If the register is updated at the end of the day or week, an emergency mid-morning when new workers arrived at 8am but have not yet been added results in an incomplete roll-call.

5

Register not available at the muster point

The register must be immediately accessible during an emergency. Many sites use a duplicate: master copy in the office, laminated summary at the muster point or in the site manager's pocket.

4. Frequently Asked Questions

Is the induction register the same as an attendance register?

No — they are different documents. The induction register is a cumulative record of all inductees over the project. The attendance register records who is on site on a given day. In an emergency, both are needed: attendance tells who was on site today, and the induction register tells who is authorised.

Can the register be digital?

Yes. Digital systems are increasingly common on larger sites. The register must be immediately accessible during an emergency (not dependent on internet), backed up regularly, and capable of producing a printed roll-call quickly. Many sites maintain a printed backup.

How long should induction registers be retained?

Minimum 3 years after the construction phase ends (personal injury limitation). For long-latency disease exposure (asbestos, silica, lead), retain for 40 years.

What if a worker arrives and the inductor is not available?

No worker should begin without an induction. Options: a secondary designated inductor; the worker waits; or a brief verbal emergency briefing while scheduling the full induction. "Just go ahead and start — we will induct you later" is a compliance failure.

Generate your Site Induction Register on Construction Suite

Construction Suite walks you through every required section with a guided Q&A — built to CDM 2015 — and generates a professionally formatted document in minutes.

Get started free

This guide is for general informational purposes only and does not constitute legal advice. While every effort is made to ensure accuracy, regulations change and individual project circumstances vary. Construction Suite is a trading name of Xzist Digital Ltd, registered in England and Wales.

Generate this document